SMART Estimator

SMART Estimator 2025 Release Notes


SMART Estimator Version 2025.6 (Build 1652)
November 2025

The following enhancements have been made in this version of SMART Estimator:

  • Bug FixedContract items using the ERR pricing type can now be copied without causing the application to crash.
  • Bug FixedChanges to the Dimension Description option are now saved and restored properly when SMART Estimator is restarted.
  • Bug FixedBirdcage scaffolds now generate correctly even when the scaffold width is less than the available transom.
  • Bug FixedChanges to the board material in Schedule IT are now saved and reflected as expected.
  • OtherMore detailed technical error information is now displayed when an error occurs during SMART Estimator launch.

SMART Estimator Version 2025.3 public (Build 1547)
September 2025

The following enhancements have been made in this version of SMART Estimator:

  • UpdatedThe project grid now displays Category as a column instead of a group, with the ability to filter by Category.

SMART Estimator Version 2025.2 public (Build 1432)
July 2025

The following enhancements have been made in this version of SMART Estimator:

  • Bug FixedCorrected issue with applying scaffold height, width, length, and other board and lift properties from the header row in Schedule IT to all relevant scaffolds.
  • Bug FixedLift count selection is now retained in the Item Description SMART Text.
  • Bug FixedResolved header update behaviour in the quotation section when the “Different First Page” setting is enabled.
  • Bug FixedUser-edited signature image now correctly updates in quotation.

SMART Estimator Version 2025.0 public (Build 1219)
April 2025

The following enhancements have been made in this version of SMART Estimator:

  • AddedThe G-Deck scaffolding system is now available! G-Deck safety decking is available under the new G-Deck scaffolding system.