Summary of the Module

The Chimney stack scaffolding module checks tube and fitting chimney stack scaffolding for compliance with TG20:21. A chimney stack scaffold provides a working platform at a chimney, reached from an access tower or independent scaffold that is supported by its own foundations.

Calculations and Checks

The standard TG20:21 chimney stack scaffold arrangements can be checked:

  • Scaffolding for a chimney at the gable end.
  • Scaffolding for a chimney at the ridge, accessed via a walkway or provided with a double-width, two-bay working area.
  • Scaffolding for a chimney at the eaves, with a partial saddle at the front and sides of the chimney or a saddle that encloses the chimney.
  • Chimney stack scaffolds of TG20 compliant galvanised Type 4 or high-tensile steel tubes.

The dimensions of the scaffold are not entered. Instead, the TG20:21 limits for a chimney stack scaffold are stated in the compliance report: a maximum working load of 1.5 kN/m², a maximum bay length of 2.0 m and a maximum platform width of 4 boards.

The software calculates the site wind factor and checks whether the scaffold is TG20:21 compliant. If so, it reports the maximum leg load on the roof and the compliance criteria that must be observed. Please note that:

  • A TG20:21 compliant chimney stack scaffold is not permitted at a site with an extreme wind exposure, so the TG20 check fails if the site wind factor exceeds 30.5.
  • The wind factor is calculated at a height of 13.0 m, which allows for a chimney base up to 11.5 m high, typical of a three-storey townhouse, plus the top guard rail.
  • The access tower or independent scaffold is not included in the check. A separate TG20 compliance report or bespoke design is required for it.
  • The adequacy of the roof to support the scaffold is not checked. The compliance report always includes a warning that the responsibility for the adequacy of the roof must be established before work commences, so a compliant scaffold passes with warnings.

The following sections provide details of the user inputs required, and also explain the outputs provided by the software.

Display Panel Options

The display panel options are similar to that of the Tied independent scaffolding module, with the following options available:

Options Available to you:

  • Map
  • A map is provided to search for the site address and specify the site location. You can input the address in the same way as for the TG20:21 wind factor module. The site address (in the right-hand panel) is populated automatically from Google Maps services. This address can be manually overwritten if required.

    The site wind factor is automatically calculated from the site location, in accordance with Appendix A.2 of the TG20:21 Design Guide, as also described for the TG20:21 wind factor module.

  • 3D model
  • A 3D preview of the chimney stack scaffold is displayed with the roof, the chimney and the access tower, which updates as the input options are selected. The preview illustrates a typical arrangement: the actual configuration of the scaffolding will depend on the roof and chimney dimensions. Holding down the left mouse button will allow you to rotate the view, the mouse scroll wheel can be used to zoom in or out and holding the right mouse button will allow you to pan the view.

  • 2D view
  • 2D illustrations of the chimney stack scaffold are provided in first-angle projection, displaying the front elevation, side elevation and plan view. The plan view is dimensioned with the maximum bay length and platform width permitted by TG20:21.

  • Calculation report
  • A summary report is provided when the calculations are performed, including an illustration of the scaffold, the site location and wind factor, the chimney stack configuration, the maximum leg load on the roof and the results of the TG20:21 check.

Input Panel Options


Site

The following options are available for selecting the site location and wind exposure:

Input Description
Site details The site address can be selected by searching for an address from the Search bar above the map, or by moving the site marker. This address can be manually overwritten if required, which does not alter the location of the site on the map.
Consider sheltering from nearby buildings Select this option to reduce the wind exposure by considering the sheltering effects of nearby buildings. The sheltering effect is only applicable to wind sectors that are calculated as being within town terrain.
Design life Select if the structure is a temporary structure (≤ 2 years) or if it is a long-standing/permanent structure.
Standing during Select the spring and summer option to reduce the wind exposure for scaffolds or temporary structures standing only between April and September. This option is applicable only if the design life is set as ≤ 2 years.

Scaffolding

You can select the chimney stack scaffold arrangement and materials by selecting the Scaffolding tab, this will automatically switch the display from the map to the 3D model. The 3D model updates whenever the inputs are modified.

Input Description
Chimney location Select the location of the chimney stack on the roof: at the gable end, at the ridge or at the eaves.
Access platform

For a ridge chimney, select whether the chimney will be accessed via a walkway, or a double-width two-bay working area will be provided.

For an eaves chimney, select whether the saddle will be provided at the front and sides of the chimney (partial saddle), or will enclose the chimney (enclosing saddle).

This input is not displayed for a gable end chimney.

Tube material

The tube material from which the scaffold will be constructed, in accordance with TG20:21 Operational Guide section 4.1:

  • Type 4 galvanised steel tubes to BS EN 39.
  • Cold formed galvanised steel tubes to BS EN 10219-1, grade S 355.
  • Hot formed galvanised steel tubes to BS EN 10210-1, grade S 355.

The tube material can be identified on delivery with a stamped marking or attached tag stating the steel designation, for example ‘EN 10219 – S 355 JOH’.