November’s Project of the Month: WB Scaffolding at Smash Burger, Brighton.
This month we’re featuring WB Scaffolding for their fast, safe, and well-coordinated delivery on a tightly constrained, live high street site in the heart of Brighton.
The project involved scaffolding for roofing repairs and painting works above the Smash Burger restaurant, a busy, operational site that demanded a quick turnaround, professional presentation, and careful planning from start to finish.
By using SMART Estimator, WB Scaffolding were able to model the scaffold in advance, giving the client a clear visual reference while streamlining logistics, improving communication, and ensuring all materials were prepared the day before the install.
Fast, Safe, and Professional!
WB Scaffolding specialise in scaffolding erection for refurbishment and repair projects. Their reputation is built on a simple formula: quick turnaround and safe working, especially in environments where time, access, and public safety are critical.
Smash Burger Brighton presented exactly that kind of challenge.
The Project: Smash Burger Brighton:
Located on a busy high street, the site required scaffolding to support roofing works and painting above an open, operational business. To deliver this efficiently, the team started installation in the early hours with a large crew on-site, erecting the scaffold safely and without disruption to the surrounding businesses or foot traffic.
“We’re used to fast-paced refurb jobs, but this one needed early starts, good planning, and a solid team to get it up quickly and safely.”
Key Safety & Site Measures:
- Safety and compliance were core to the setup:
- Double boarding was used on the first lift to protect the public and workers below
- Debris netting was added to all sides
- Chapter 8 barriers were deployed to safely segregate pedestrians on the street during install
In a high-footfall zone, these precautions were essential to maintaining both safety and public confidence.
SMART Estimator in Action:
WB Scaffolding used SMART Estimator throughout the project to help plan and communicate the scaffold setup before arriving on site.
- They created a like-for-like visual model of the scaffold, allowing the client to see exactly how it would appear against the building
- The model made it easy to agree lift heights which supported planning and team alignment
- A load list was generated in advance, helping the team prepare the required equipment the day before
- These visuals also supported the company’s professional image, helping the client understand the plan and instilling confidence in the process
SMART Estimator gave WB Scaffolding the tools to model the job clearly and deliver with accuracy, even in a constrained city-centre environment with strict timing and safety requirements.
Takeaways and Looking Ahead
The main takeaway from this project? Experience in navigating busy public environments, with the added reassurance of accurate visuals and planning tools to back up decision-making and help the team stay on track.
“SMART Estimator makes it easier to agree everything early – heights, kit, and what it’ll look like. That saves time and gives our clients confidence.”
Looking ahead, WB Scaffolding is continuing its push to expand, with a strong focus on maintaining safe, secure access on every job. With tools like SMART Scaffolder, they’re reducing design costs, shortening turnaround times, and building a more professional, scalable scaffolding service.
Built for Scaffolders Like WB:
SMART Scaffolder helps scaffolding businesses present their work with confidence, plan more efficiently, and maintain total control over costs and materials. Whether you’re working overnight on a retail refurb or tackling a complex city-centre job, SMART Scaffolder gives you the tools to build it right, first time.
Recent posts
Why Accurate Incident Reporting Matters: Staying Compliant with RIDDOR 2013
Why Tie Testing Matters: Staying Compliant with NASC TG4:25
October’s Project of the Month: Amphibian Scaffolding at Chartwell Hockley Industrial Centre
Why Harness Inspections Matter: Staying Compliant with NASC SG16:23
September’s Project of the Month: OAK Scaffolding Limited: Caterham School
Why the Scaffolding Industry Must Embrace Technology
August’s Project of the Month: SAY Access Limited at Appleton Academy
Sustainability Through Innovation in Construction:
Project of the Month: July – JRS Scaffolding
Case Study: Transforming Scaffold Inspections at Enigma Industrial Services
Bridging the Skills Gap in Scaffolding: How Technology Can Attract the Next Generation
Project of the Month – June – Blenheim Palace
SMART Scaffolder’s 20th Anniversary event
Engineering Smart Solutions in Tight Spaces: PJ Slater’s Stamford & Rutland Hospital Project
Why Every Scaffolding Company Needs a Strong GRC Framework –
Sonic Scaffolding 2000 ltd is driving Project Success with SMART Estimator’s Accurate 3D Planning
Infiniti Scaffolding LTD: Boosting Efficiency with SMART Inspector: A Success Story
Building Safer Heights: Tackling Falls with Better Scaffolding Practices
The Future of Scaffolding Workflow software
SCA Group’s Centenary Quays Project: Project of the Month January 2025
Battling the Elements: How to Keep Your Scaffolds Safe in Adverse Weather
Navigating Scaffold Safety: The Critical Importance of Handover Certificates