SMART COMPLIANCE

From site address to design compliance. In minutes.

Wind factor, tie duties, leg loads and beam checks, done properly and documented, without the design queue.

From £75 a month per company · Free trial, no card needed

Watch the 4-minute demo. Bring a live job to your call and we’ll run it for you.

From the team behind the original TG20 eGuide softwareTG20:21 · BS EN 12811-1 · BS EN 1991-1-4Runs in your browser: PC, Mac, tablet, phone

Stop waiting on calcs. Start building.

Sheeted, exposed, a loading bay, a bridge over the entrance. The moment a scaffold leaves the standard compliance sheet, the job waits for a calc. SMART Compliance puts those checks in your hands.

Scaffold contractors

Jobs stuck in the design queue.

Check sheeted and exposed scaffolds yourself, get the fix when one fails, and start on time.

Scaffold designers

Hours on wind factors and spreadsheets.

Turn routine wind factors, tie duties and beam checks round in minutes, and keep your time for the complex designs.

Temporary works engineers

Calcs that are hard to check.

Get consistent, standards-referenced reports with every input, wind sector and calculation step shown.

How it works

TG20:21 wind factor rose for a coastal site in SMART Compliance
1

Locate

Enter the site address or postcode. SMART Compliance works out the TG20:21 wind factor in all 12 directions from real altitude, terrain and distance to the coast, with a 3D view of the site. No Google Earth. No spreadsheets.

Failed compliance check showing suggested fixes in SMART Compliance
2

Check & fix

Set up the scaffold: load class, dimensions, boarding and cladding, and the 3D model builds as you go. If it fails, you get compliant options, such as a different tie pattern or double standards, so you avoid a bespoke design where you can.

TG20:21 compliance criteria in the SMART Compliance calculation report
3

Report

Export a summary, full calculations or step-by-step detail to PDF or Word, ready for the client, principal contractor or temporary works coordinator. Save to SMART Scaffolder Cloud so office and site see the same report, or keep files on your own machine.

BEYOND TG20

Design calcs and bridge beams, not just compliance sheets

When a scaffold needs a design, the calculation modules work out leg loads and tie duties and check them against BS EN 12811-1 and BS EN 1991-1-4.

  • Bridge spans up to 20 m, depending on the beam
  • Beam library from Apollo, DESSA, Generation and TRAD, or define your own
  • Full design report: beam capacity, deflection and coupler checks
16 m bridge beam span with leg loads in SMART Compliance
Beam capacity and deflection checks in the bridge design report
3D site topography used for wind analysis

What it checks

Tube and fitting scaffolds in the UK and Ireland, to TG20:21, plus design calculations when a scaffold goes beyond it.

TG20:21 compliance checks

Tied independent
Tied tower
Free-standing tower
Internal birdcage
Loading bay
Lift shaft tower
Mobile tower
Chimney scaffolds: coming end of 2026

Calculations and analysis

TG20:21 wind factor in 12 wind sectors, with 3D site view
Leg loads and tie duties to BS EN 12811-1
Bridge beam design, spans up to 20 m
Wind loading to BS EN 1991-1-4
Reports in PDF or Word
Tyler, Smartway Scaffolding

“It was very easy for us to start using SMART Compliance on projects. Two minutes having a little experiment with it, and you’re good to go.”

Tyler, Smartway Scaffolding

Request a demo

SMART Compliance
From
£75 /month
per company · additional users £15 each
  • All compliance check and calculation modules
  • TG20:21 wind analysis with 3D site view
  • PDF and Word reports
  • Save to SMART Scaffolder Cloud or locally
  • Runs in your browser on PC, Mac, tablet or phone
No card needed. Or request a demo and we’ll run one of your jobs live.

Questions

Does it replace my scaffold designer?

No. It handles routine checks and calcs so your designer can focus on genuinely bespoke work. Compliance checks are for competent persons familiar with TG20:21.

Which standards does it use?

NASC TG20:21, BS EN 12811-1 for tube and fitting scaffolds, BS EN 1991-1-4 for wind, and BS 5975.

Does it cover system scaffold?

No. SMART Compliance covers tube and fitting scaffolds to TG20:21. It doesn’t check system scaffolds.

What do I need to run it?

A web browser on a PC, Mac, tablet or phone. Nothing to install.

Where is my data stored?

You choose. Save to the SMART Scaffolder Cloud server so your office and site teams share the same files, or save them locally on your own machine.

How much does it cost?

From £75 a month per company, with additional users at £15 each. Start with a free trial, no card needed.

Book a demo or start your free trial

Choose a 20-minute demo built around one of your own scaffolds, or a free trial with no card needed. Our team will be in touch to set it up.

  • No obligation, no hard sell
  • See it on your work, not ours
  • From £75 a month per company when you’re ready

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
I'd like to*