Quick Answer

A TG20 Compliance Sheet is a document generated through the NASC TG20 ePortal that demonstrates a tube and fitting scaffold complies with TG20:21 guidance. It provides evidence that the scaffold falls within recognised industry standards and can be erected without requiring a bespoke scaffold design.

What Is a TG20 Compliance Sheet?

A TG20 Compliance Sheet is a document generated through the NASC TG20 ePortal that demonstrates a scaffold configuration complies with the requirements of TG20:21.

The sheet summarises key information about the scaffold, including its dimensions, loading classification, tie arrangement and compliance status. It provides evidence that the scaffold falls within recognised industry guidance and can therefore be erected without a bespoke design.

It is important to understand that a compliance sheet is not a scaffold design. It is evidence that a scaffold configuration falls within the limits of TG20 guidance.

What Information Does a TG20 Compliance Sheet Contain?

A TG20 Compliance Sheet typically includes:

  • Scaffold dimensions and geometry
  • Bay lengths and lift heights
  • Working platform duty rating
  • Tie pattern requirements
  • Bracing requirements
  • Permitted loading information
  • Compliance confirmation

The exact information varies depending on the scaffold configuration, but the purpose remains the same: demonstrating compliance with TG20:21.

Learn more about The NASC & TG20:21 Here
What Is a TG20 Compliance Sheet?

When Can a TG20 Compliance Sheet Be Used?

Tube and Fitting Scaffold Type

Tied Independent Scaffold

Basic Internal Birdcage Scaffold

Attached Loading Bay

Ladder Access Tower

Basic Beamed Bridge

Cantilever Scaffold

Suspended Scaffold

Temporary Roof Scaffold

Typically Covered by TG20?

Yes

Yes

Yes

Yes

Often

No

No

No

When Is a TG20 Compliance Sheet Not Enough?

A compliance sheet cannot be used if the scaffold falls outside the scope of TG20 guidance.

Examples include:

  • Significant cantilevers
  • Large bridging arrangements
  • Complex temporary roofs
  • Unusual loading conditions
  • Non-standard tie patterns
  • Suspended scaffolds
  • Complex geometries

In these situations, a scaffold design may be required to demonstrate structural adequacy.

Does My Scaffold Need a Design?
When Is a TG20 Compliance Sheet Not Enough?

Who Requests TG20 Compliance Sheets?

Compliance sheets are commonly requested by:

  • Principal contractors
  • Temporary works coordinators
  • Site managers
  • Health and safety teams
  • Scaffold inspectors
  • Clients and asset owners

Providing clear compliance documentation helps demonstrate that scaffold compliance has been properly assessed before work begins.

Who Requests TG20 Compliance Sheets?

TG20 Compliance Sheets vs Scaffold Designs

TG20 Compliance Sheet

Demonstrates Compliance with TG20:21

Used for Standard scaffold configurations

Generated from Tg20:21 Guidance

No Project-specific Calculations

Suitable for Compliant Scaffolds only

Scaffold Design

Provides bespoke Engineering Assessment

Used for Non-standard scaffolds

Produced by a Scaffold Designer

Includes project-specific calculations

Required for Scaffolds outside of Guidance

How Do You Check Whether a Scaffold Complies with TG20?

Before a compliance sheet can be produced, the scaffold must be assessed against TG20 requirements.

This includes verifying:

  • Scaffold geometry
  • Platform loading
  • Tie arrangements
  • Bracing requirements
  • Wind loading assumptions
  • Access arrangements

Many scaffold companies now use digital compliance tools to verify compliance before progressing with projects, helping to reduce risk and improve consistency.

How Do You Check Whether a Scaffold Complies with TG20?

How SMART Compliance Helps

While the NASC TG20 ePortal generates TG20 Compliance Sheets, scaffold contractors still need a reliable way to assess whether a scaffold is compliant before reaching that stage.

SMART Compliance helps scaffold businesses quickly check scaffold configurations against TG20:21 and TG30:24 guidance, providing a clear pass/fail assessment and identifying when a scaffold falls outside recognised compliance limits.

Developed by CADS, the engineering software company whose team helped develop both TG20 and TG30 guidance, SMART Compliance gives contractors confidence that scaffold compliance has been assessed consistently and accurately.

Benefits include:

  • Faster compliance checking
  • Reduced manual assessment
  • Improved consistency
  • Auditable compliance records
  • Support for both TG20 and TG30 workflows
  • Early identification of scaffolds that may require design

Book a SMART Compliance Demonstration

See how SMART Compliance helps scaffold contractors assess compliance faster and with greater confidence.

Book a demo now
How SMART Compliance Helps

Frequently Asked Questions

Is a TG20 Compliance Sheet a scaffold design?

No. A TG20 Compliance Sheet demonstrates that a scaffold falls within TG20 guidance. It does not replace a scaffold design where one is required.

Who can produce a TG20 Compliance Sheet?

TG20 Compliance Sheets are generated through the NASC TG20 ePortal.

Does every scaffold need a TG20 Compliance Sheet?

Not necessarily, but many contractors use them to demonstrate compliance and satisfy client or principal contractor requirements.

What happens if a scaffold falls outside TG20?

The scaffold may require a bespoke design prepared by a competent scaffold designer.

Can SMART Compliance generate TG20 Compliance Sheets?

No. TG20 Compliance Sheets are generated through the NASC TG20 ePortal. SMART Compliance helps contractors assess scaffold compliance and identify whether a scaffold falls within TG20 or TG30 guidance.

Frequently Asked Questions

Risks of Assuming a Scaffold Doesn't Need a Design

Incorrectly treating a scaffold as TG20 or TG30 compliant can result in:

Delays on site

Failed inspections

Additional costs

Project disruption

Increased liability

Safety risks

For this reason, scaffold contractors should always verify compliance before erection begins.