From site address to design compliance. In minutes.
Wind factor, tie duties, leg loads and beam checks, done properly and documented, without the design queue.
From £75 a month per company · Free trial, no card needed
Watch the 4-minute demo. Bring a live job to your call and we’ll run it for you.
Stop waiting on calcs. Start building.
Sheeted, exposed, a loading bay, a bridge over the entrance. The moment a scaffold leaves the standard compliance sheet, the job waits for a calc. SMART Compliance puts those checks in your hands.
Scaffold contractors
Jobs stuck in the design queue.
Check sheeted and exposed scaffolds yourself, get the fix when one fails, and start on time.
Scaffold designers
Hours on wind factors and spreadsheets.
Turn routine wind factors, tie duties and beam checks round in minutes, and keep your time for the complex designs.
Temporary works engineers
Calcs that are hard to check.
Get consistent, standards-referenced reports with every input, wind sector and calculation step shown.
How it works
Locate
Enter the site address or postcode. SMART Compliance works out the TG20:21 wind factor in all 12 directions from real altitude, terrain and distance to the coast, with a 3D view of the site. No Google Earth. No spreadsheets.
Check & fix
Set up the scaffold: load class, dimensions, boarding and cladding, and the 3D model builds as you go. If it fails, you get compliant options, such as a different tie pattern or double standards, so you avoid a bespoke design where you can.
Report
Export a summary, full calculations or step-by-step detail to PDF or Word, ready for the client, principal contractor or temporary works coordinator. Save to SMART Scaffolder Cloud so office and site see the same report, or keep files on your own machine.
Design calcs and bridge beams, not just compliance sheets
When a scaffold needs a design, the calculation modules work out leg loads and tie duties and check them against BS EN 12811-1 and BS EN 1991-1-4.
- Bridge spans up to 20 m, depending on the beam
- Beam library from Apollo, DESSA, Generation and TRAD, or define your own
- Full design report: beam capacity, deflection and coupler checks
What it checks
Tube and fitting scaffolds in the UK and Ireland, to TG20:21, plus design calculations when a scaffold goes beyond it.
TG20:21 compliance checks
Calculations and analysis
“It was very easy for us to start using SMART Compliance on projects. Two minutes having a little experiment with it, and you’re good to go.”
Tyler, Smartway Scaffolding
- All compliance check and calculation modules
- TG20:21 wind analysis with 3D site view
- PDF and Word reports
- Save to SMART Scaffolder Cloud or locally
- Runs in your browser on PC, Mac, tablet or phone
Questions
Does it replace my scaffold designer?
No. It handles routine checks and calcs so your designer can focus on genuinely bespoke work. Compliance checks are for competent persons familiar with TG20:21.
Which standards does it use?
NASC TG20:21, BS EN 12811-1 for tube and fitting scaffolds, BS EN 1991-1-4 for wind, and BS 5975.
Does it cover system scaffold?
No. SMART Compliance covers tube and fitting scaffolds to TG20:21. It doesn’t check system scaffolds.
What do I need to run it?
A web browser on a PC, Mac, tablet or phone. Nothing to install.
Where is my data stored?
You choose. Save to the SMART Scaffolder Cloud server so your office and site teams share the same files, or save them locally on your own machine.
How much does it cost?
From £75 a month per company, with additional users at £15 each. Start with a free trial, no card needed.
Book a demo or start your free trial
Choose a 20-minute demo built around one of your own scaffolds, or a free trial with no card needed. Our team will be in touch to set it up.
- No obligation, no hard sell
- See it on your work, not ours
- From £75 a month per company when you’re ready
"*" indicates required fields